Milestone 4

CSC 333 Project Status Report                                                                                  

Project Name: HELP
Team Members: Dave Hess, Robert Lusk, Ria Ghose

Team Lead: Ria Ghose

Date Report Submitted: April 6, 2004
Time Period Reporting On: March 12 – April 6

1.      Progress Made

All tables that are to be incorporated within the database have been created in SQL, as well as an HTML version of our graphical user interface.  With the creation of these two vital parts of our project, we can relate the tables and connect the GUI to the database using JSP.

 

2.      Plans for Upcoming Time Period Until Next Status Report Due

Our upcoming objectives are to finalize all changes and make sure increment 1 is complete.  We then will begin Milestone 5 and start implementing increment 2 into our project.

 

3.      Issues Resolved

We talked to John Scarpato and about the searchable and required fields for the DB and the GUI.

 

4.      New Issues to be Addressed

With the changes occurring within our increments, we may tend to run into some complications with the actual finalizing of increment 2.  JSP will be a huge challenge for our team.  It will require much research and time implemented into the project.

 

 

 

 

 

 

 

 

 

Milestone 4 Completion Document

Milestone Completion Summary for CSC333 (Spring, 2004)

 Milestone Number: 4

Team Name: HELP ministries

Team Members (and Roles, including leader):

Dave Hess: —Visited HELP and helped and created the HTML version of the GUI.

Robert Lusk: Documentations, completion summary, team notes, research on JSP

Ria Ghose: (Lead) Visited HELP and created Tables using SQL

Due Date: 2004-4-6

Summary of Results of Milestone: 3

We have finalized all creations of tables and the GUI, as well as reviewed and corrected the database up until this point. All results are summarized in the following:

·        All Tables in the database were created using SQL.

·        Graphical User Interface was created using HTML.

·        PHP MyAdmin configured for project.

·        JSP researched for incorporation into project


Strengths of Milestone: 4

·        Now that we have the system overview understood, and the creation of both the tables and the GUI, we can now understand more fully where we stand in the status of our project and can progress towards a functional prototype.

Weaknesses of Milestone: 4

·        This milestone does not capture all the information of the current HELP database. We found out about some aspect of the DB. We are not sure that we will have enough time to implement them. So our rendition of HELP DB will not be a complete replacement.

Project Status:

Green

 

Effort:

GUI creation – Dave
SQL Tables creation – Ria and Dave
JSP research– Bobby
Meeting with HELP – Ria, Dave
Completion summary – Bobby, Ria
Modifying SRS (increments) – Bobby

Team Meeting Notes – Bobby, Ria

Update of Team Web Page – Dave